Altea Energy
Analysis work, investigations and engineering recommendations in order to remedy defects in inspected and inspected wells, based on data relating to the history of wells (geological, forage, completion, production or injection, etc.), on current parameters (production, reservoir pressure, annular space pressures) and other risk factors identified during the included and in-depth wellhead audit and inspection.
- The necessary investigations to be carried out at the end of the audit work are, for example, as follows:
- By Slick Line (calibration, top sediment and others, PFS, etc.)
- By Logging (PLT, Full off, thermometry, video camera descent, trace scan, etc.)
- By test measurements on the separator.
- Recommendations on inspected wells requiring medium and heavy interventions will be provided by the SERVICE PROVIDER’s specialists following the analyzes and various investigations. These analyzes and investigations will be the subject of the establishment of a decision tree, defining the operations to be carried out.
- Maintain and avoid the drop in production due to the closure of non-integrated wells;
- Optimize interventions and minimize costs;
- Monitoring and application of oil industry standards;
- Assist the IT engineer during the implementation of a database management system relating to well integrity;
- Ensure safety and avoid contamination of resources;
- Identify the most frequent problems;
- Coaching and transfer of skills and know-how for the benefit of the CUSTOMER’s on-site staff;
- Take charge of the study of wells closed following an integrity problem with a view to commissioning.
To apply for this job please visit altea-energy.com.
Be the first to comment